Speck-electronics EQ16 Manuel d'utilisateur Page 10

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 33
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 9
Merely affixing the Model EQ16 into an equipment rack is no guarantee
that the product is making a reliable ground connection. The mounting
rails in the equipment rack should never be depended upon for a ground
connection.
The following information is provided as a general guide for
repackaging your Model EQ16 for shipment. If you have any questions,
contact your local Speck Dealer or Speck Electronics direct.
If the product is to be shipped to Speck Electronics for service or repair,
attach a tag to the product, identifying the owner and indicating the
service or repair to be accomplished. Include the model number and
serial number of the product. Place the product in the original container
if available. If the original container in not available, a suitable one can
be purchased from Speck Electronics.
If the original container is not used, wrap the product in heavy plastic
before placing in an inner container. Use plenty of packing material
around all sides of the product and protect panel faces with cardboard
strips. Mark shipping container with "Delicate Instrument" or "Fragile",
and insure the shipment for the proper amount.
Repacking For
Shipment
6
Rack grounding
Chapter 2 Initial Preparation
Vue de la page 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 32 33

Commentaires sur ces manuels

Pas de commentaire